Risk Assessment
FILM PRODUCTION RISK ASSESSMENT
Production Title Starship Productions | Production Date(s) February 2011 – April 2011 |
Producers Names Lizzie Smith, Shereen Sagoo and Kayleigh Turner | Directors Names Lizzie Smith, Shereen Sagoo and Kayleigh Turner |
Date of Risk Assessment 9h February 2011 | Risk Assessment conducted by Lizzie Smith, Shereen Sagoo and Kayleigh Turner |
Hazard | Persons who may be harmed | Property which may be damaged | Risk controls already in place | Risk Assessment LOW, MODERATE, HIGH, EXTREME (see table) | Further action required to control risk |
Driveway/cars | All actresses and directors | Camera equipment | Pavement at the side of driveway and roundabout | Unlikely High | Warn all persons to take extra care. |
Trolley for filming | Directors | N/A | Handle to control the wheels of the trolley | Unlikely Low | Warn all persons to take extra care. |
Temperature/weather | All actresses and directors | Camera equipment could get wet | None | Unlikely/Moderate Low | Check weather forecast, ensure actresses are dressed appropriately |
Road outside | One actress and directors | Camera equipment | Pavement | Rare high | Warn all persons to take extra care. |
Having observed your filming, I can confirm that you took good care of your actors and observed the risk assessment carefully to ensure both people and equipment involved were kept safe. Great work.
ReplyDelete